BETONGROUPSERVICE ☎ 555 41 22 24
ბეტონის მოპრიალება მოსაპრიალებელი მანქანით საწყობში ბეტონის დასხმა ტუმბოთი და გასწორება ვიბრორეიკით არმატურის ბადე სადგამებზე ჰიდროიზოლაციის აპკზე
Concrete floors · full cycle

Concrete floors from bare ground to shine

We prepare the ground, reinforce, pour and power-trowel. One crew does all four stages.

60–90 ₾per m², all included
4stages, one crew
10–20 cmslab thickness

How the floor is made

01 / 04

Ground preparation

We level and compact the soil, lay a sand-gravel base and a waterproof membrane. A solid base protects the floor from cracks and settling.

  • Levelling and compaction
  • Sand-gravel layer
  • Waterproof membrane
02 / 04

Reinforcement

We lay steel mesh on spacers so the rebar sits in the middle of the slab. That way the slab carries load and does not crack.

  • Steel rebar mesh
  • Spacers (chairs)
  • Mesh tied at crossings
03 / 04

Pouring

Concrete arrives by mixer truck. We pour in one go, level it to the guides with a vibrating screed and drive out the air.

  • Mixer truck or pump
  • Vibrating screed and guides
  • One even thickness
04 / 04

Power troweling

Once the concrete sets, we spread a hardener and compact the surface with a power trowel. The floor becomes smooth, dense and nearly dust-free.

  • Hardener topping
  • Mechanical troweling
  • Control joint cutting
↓Scroll

Why us

01

One crew

From bare ground to troweling, one crew does every stage, so work never stalls between stages and each one fits the next.

02

Price up front

You see the price on the site. After visiting the site we give you the exact sum in writing.

03

Our own machines

Compactors, screeds and power trowels are ours, so we keep to the schedule.

04

Any site

Garage, yard, warehouse, workshop, car wash.

Calculate the price

Enter the address and the area. The price covers all four stages, materials and labour.

Estimated cost
—
60–90 ₾ / m²
  • Ground preparation
  • Reinforcement
  • Pouring
  • Power troweling

The exact price is set after we see the site and depends on the ground, thickness and access.

555 41 22 24Call
598 33 37 70Call

FAQ

How long does it take?

A 100–300 m² site usually takes 2–4 working days. You can walk on it in 1–2 days, park a car after about 7 days, and full strength comes at 28 days.

Why 60 to 90 GEL per m²?

It depends on slab thickness, ground condition and area. Larger areas cost less per m². We confirm the exact sum after seeing the site.

What is a hardener topping?

A dry-shake mix worked into the surface while troweling. It makes the floor harder, more wear-resistant and less dusty.

Do you work in winter?

Yes. Below +5°C we use winter admixtures or schedule the pour for warmer days.

Can you do just one stage?

No, we only do the full cycle. That is how we can guarantee the result.

Call